Construction of Melnikova Street (from Zarichanska Street to Trudova Street) in Khmelnytskyi (correction)
Construction of Melnikova Street (from Zarichanska Street to Trudova Street) in Khmelnytskyi (correction)
Total project budget
115 227 179 UAH
Project goal: The goal of the project is to create a modern, safe and comfortable transport infrastructure in the northern part of the city of Khmelnytskyi by building a new Melnikova Street, which will provide an effective connection between Zarichanska Street, Starokostyantynivske Highway and Trudova Street, improve intra-city mobility and promote the further development of adjacent residential and public areas. The goal is to be achieved by building a full-fledged street with a two-lane carriageway (2×3.75 m), arranging safety strips (2×0.3 m), two-way sidewalks 2.25 m wide, a two-way bicycle path 2.5 m wide, as well as a green area with about 900 turf bushes. The comprehensive creation of transport and pedestrian infrastructure will include the installation of road surfaces, drainage systems, lighting, landscaping and traffic safety.