Major renovation of the premises of the building of the medical and health complex "G-2" of the Out-of-town children's health and recreation institution "Chaika" of the Khmelnytskyi City Council at the address: Khmelnytskyi region, Khmelnytskyi district, village of Holovchyntsi, Pidlisna st., 4/1 with the implementation of energy efficiency measures
Major renovation of the premises of the building of the medical and health complex "G-2" of the Out-of-town children's health and recreation institution "Chaika" of the Khmelnytskyi City Council at the address: Khmelnytskyi region, Khmelnytskyi district, village of Holovchyntsi, Pidlisna st., 4/1 with the implementation of energy efficiency measures
Total project budget
26 973 871 UAH
Project goal: The goal of the project is to create modern, safe and energy-efficient conditions for the functioning of the medical and health complex "G-2" through a comprehensive overhaul of the building, redevelopment of the premises in accordance with functional needs and the introduction of a full cycle of engineering systems that the facility did not previously have. The goal will be achieved by implementing architectural and construction works, arranging internal water supply and sewage networks, installing a new modular heating and hot water supply system, which is being installed for the first time due to the complete absence of heating, arranging ventilation, modernizing electrical networks, installing an automatic fire alarm system, a centralized fire surveillance system and a people evacuation control system. The current condition of the building is characterized by significant physical deterioration of structures, the absence of any heat engineering systems, non-compliance with energy efficiency requirements, sanitary and fire safety standards, as well as irrational planning, which limits the possibility of its use for its intended purpose. The target state involves the creation of a completely renovated, energy-efficient, safe and functional facility, equipped with modern engineering networks, rational planning and a high level of comfort, which will ensure effective and long-term operation of the complex.