Total project budget
7 999 450 UAH
Project goal: It is planned to carry out a major overhaul of the existing network by laying a gravity sewer, which will allow saving electricity used by sewage pumping stations and ensuring the sanitary and epidemiological well-being of the population.
The construction of new networks is planned with PVC pipes. The diameter of the pipes is taken according to the calculation of 100-300 mm. The average depth of laying the pipes is 1.5 - 2.5 m. The use of PVC pipes in the construction guarantees increased (up to 50 years) durability of its operation and reduces the risk of the need for emergency work.
Discharge is planned to the existing sewage treatment plant, or when implementing a gravity network to the existing well. Water supply is provided from the existing water supply network.