Digital platform for civic engagement in European integration:
Khmelnytska oblast

Major repairs of the intra-block road from Ozernaya St. to building 6/2-G on Ozernaya St. in Khmelnytskyi

Idea

Major repairs of the intra-block road from Ozernaya St. to building 6/2-G on Ozernaya St. in Khmelnytskyi

Idea
TC: Khmelnytska urban hromada
Territorial community (Customer): Khmelnytska urban hromada
Partner executor: УПРАВЛІННЯ КОМУНАЛЬНОЇ ІНФРАСТРУКТУРИ ХМЕЛЬНИЦЬКОЇ МІСЬКОЇ РАДИ

Total project budget

4 605 000 UAH

Project goal: Ensuring safe, unobstructed and all-season transport and pedestrian connection of newly constructed houses on Ozernaya Street with the main road network of the city of Khmelnytskyi by constructing a modern access road. To implement the goal, it is necessary to perform the following integrated technical and organizational steps: Design and examination: development of design and estimate documentation (DED) taking into account geodetic conditions, loads and modern requirements for inclusivity. Territory preparation: clearing the right-of-way, earthworks, soil stabilization. Capital construction: installation of stable road surface (base and asphalt concrete coating) to ensure the movement of municipal, private and emergency transport. Safety and inclusivity: installation of sidewalks with tactile tiles, lowered curbs (lowerings) at crossings. Improvement: installation of road signs, marking.