Modernization of the road and transport complex and infrastructure of the city of Slavuta
Modernization of the road and transport complex and infrastructure of the city of Slavuta
Total project budget
460 368 467 UAH
Project goal: To increase the safety and comfort of movement of Slavuta residents, ensure the European quality of infrastructure and reduce long-term budget costs for current road repairs. Method of achievement: Reconstruction and major repairs of the road surface using modern technologies and materials that will ensure durability and reliability. Expansion and strengthening of road infrastructure: arrangement of roadsides, drainage. Installation of safety and comfort elements: lighting, road signs, modern markings. Arrangement of recreation areas, landscaping of the territory; Installation of small architectural forms (benches, bins, landscaping elements); Ensuring the necessary throughput capacity for servicing freight transport of industrial park enterprises. Organization of quality control of work and implementation of a technical supervision system. Integration of results into the overall community development strategy