Modernization and restoration of the bridge infrastructure of the Slavutysk urban territorial community
Modernization and restoration of the bridge infrastructure of the Slavutysk urban territorial community
Total project budget
24 180 000 UAH
Project goal: Goal: Ensuring the safe, stable and safe functioning of the transport infrastructure of the Slavuta urban territorial community, restoring the reliability of transport connections and creating safe conditions for the movement of transport and pedestrians. Methods of achievement: The goal is achieved by carrying out major repairs and reconstructions of the community's bridge facilities (in particular, the reconstruction of the emergency bridge crossing over the Bohushivka River on Ostrozka Street in Slavuta), restoring the bearing capacity of structures, installing new road surfaces, safety fences, sidewalks and related infrastructure. The existing gap between the current state and the target level: is reflected in the non-compliance of the current level of safety and technical condition of structures with regulatory requirements. Currently, the baseline indicator of restoration and modernization is 87% (incompleteness and emergency condition of components). The target value of the indicator is 100%, which implies the complete elimination of accidents, the regulatory restoration of load-bearing capacity, and the bringing of bridge facilities to the regulatory target level.