Digital platform for civic engagement in European integration:
Khmelnytska oblast

New construction of a road from the junction between Sichovykh striltsiv Street and Hetmanska Street in Khmelnytskyi

Idea

New construction of a road from the junction between Sichovykh striltsiv Street and Hetmanska Street in Khmelnytskyi

Idea
TC: Khmelnytska urban hromada
Territorial community (Customer): Khmelnytska urban hromada
Partner executor: УПРАВЛІННЯ КАПІТАЛЬНОГО БУДІВНИЦТВА ХМЕЛЬНИЦЬКОЇ МІСЬКОЇ РАДИ

Total project budget

12 661 255 UAH

Project goal: The purpose of the project is to ensure safe and convenient transport and pedestrian connection between Sichovyh Striltsiv and Hetmanska streets in the city of Khmelnytskyi by constructing a new 486 m long thoroughfare, which will improve the accessibility of the territory, increase the mobility of the population and develop the infrastructure of the microdistrict. The goal is to achieve this by performing a complex of construction works, in particular, the arrangement of the carriageway, sidewalks, drainage system, outdoor lighting. Currently, there is no proper thoroughfare that would provide direct transport and pedestrian connection between the specified streets, the existing directions of movement are disorganized or absent, which complicates the accessibility of the territory, reduces the level of safety and hinders the development of the microdistrict. The implementation of the project will allow to eliminate the existing infrastructure gap by creating a full-fledged thoroughfare that will meet modern requirements for safety, comfort and functionality of the urban environment.