New construction of a road from 18 Vinnytske Shose St. to Vinnytske Shose in Khmelnytskyi
New construction of a road from 18 Vinnytske Shose St. to Vinnytske Shose in Khmelnytskyi
Total project budget
351 500 000 UAH
Project goal: The purpose of the project is to ensure proper transport accessibility of the industrial park territory in the city of Khmelnytskyi, create conditions for the development of industrial production, attract investments, increase economic activity and form a modern engineering and transport infrastructure. The goal is to achieve this goal by constructing a new road from 18 Vinnytske Shose Street to Vinnytske Shose with the installation of a road surface of regulatory strength, surface drainage systems, the organization of safe traffic and pedestrians, the arrangement of landscaping elements, technical means of organizing traffic and engineering infrastructure in accordance with the requirements of state construction standards. Today, the transport connection of the industrial park territory is insufficiently developed or partially absent, which limits the access of specialized transport, complicates the logistics of enterprises, inhibits the attraction of investors and the development of production capacities. The existing state of the territory does not meet the regulatory requirements for road safety, capacity and operational reliability of road infrastructure. The implementation of the project will allow to eliminate the existing infrastructure gap between the current state of transport provision in the territory and the target level of functioning of the industrial park, create favorable conditions for the location of new enterprises, the development of production, the creation of jobs, and the increase in revenues to the local budget.