New construction of the road from Sichovyh striltsiv Street to Hetmanska Street in Khmelnytskyi
New construction of the road from Sichovyh striltsiv Street to Hetmanska Street in Khmelnytskyi
Total project budget
34 566 563 UAH
Project goal: The goal of the project is to ensure unhindered and safe transport and pedestrian connections of the microdistrict by building a new road from Sichovyh Striltsiv Street to Hetmanska Street in the city of Khmelnytskyi with a length of 825 m, which will contribute to improving the accessibility of the territory, developing engineering and transport infrastructure and improving the quality of life of residents. The achievement of this goal is envisaged by performing a complex of preparatory and construction works, in particular, arranging the roadway, arranging sidewalks to ensure pedestrian accessibility, building a drainage system (storm sewer), installing outdoor lighting, organizing safe traffic using road signs and markings, as well as landscaping the surrounding area.