Digital platform for civic engagement in European integration:
Khmelnytska oblast

New construction of a street from Stepana Bandera Street to Zakhidno-Okruzhnaya Street in Khmelnytskyi

Idea

New construction of a street from Stepana Bandera Street to Zakhidno-Okruzhnaya Street in Khmelnytskyi

Idea
TC: Khmelnytska urban hromada
Territorial community (Customer): Khmelnytska urban hromada
Partner executor: УПРАВЛІННЯ КАПІТАЛЬНОГО БУДІВНИЦТВА ХМЕЛЬНИЦЬКОЇ МІСЬКОЇ РАДИ

Total project budget

532 167 175 UAH

Project goal: In order to develop the engineering and transport infrastructure of Khmelnytskyi and in connection with the intensive development of the Zarechye microdistrict of Khmelnytskyi and the increase in traffic flow, the detailed design provides for the construction of a new street from Stepana Bandera Street to Zakhidno-Okruzhnaya Street.
The designed street will connect Stepana Bendera Street with Zakhidno-Okruzhnaya Street, which will allow road users to shorten the route from the central district of the city to the western ring road of Khmelnytskyi, which will reduce travel time and reduce the amount of harmful emissions into the city's atmosphere.
The designed street is planned as a main street and is classified as a street of district significance with two traffic lanes of 3.0 m each, a bicycle path 3.0 m wide and two pedestrian paths 2.25 m wide. On the right, the carriageway is separated from the pedestrian path by a green zone, 3.0 m wide. On the left, the carriageway is separated from the bicycle path by a green zone, 3.0 m wide. The total length is 2486.00 m.