Reconstruction of the pressure sewer collector from Zavodska Ploshcha St. to the intersection of Kyivska and Hrushevskoho St. in the city of Horodok
Reconstruction of the pressure sewer collector from Zavodska Ploshcha St. to the intersection of Kyivska and Hrushevskoho St. in the city of Horodok
Total project budget
9 600 000 UAH
Project goal: Ensuring stable, reliable and environmentally safe functioning of the centralized sewage system of the city of Horodok through complete reconstruction of the worn-out section of the pressure sewer collector from Zavodska Ploshcha St. to the intersection of Kyivska and Hrushevskoho Sts. with the introduction of modern high-efficiency equipment at the sewage pumping station (SPS). To achieve the set goal, a set of engineering, technical and construction measures is provided: 1. Replacement of emergency pipelines; 2. Arrangement of special crossings and protection of networks; 3. Modernization of related infrastructure and structures; 4. Updating of the technological equipment of the SPS.