Reconstruction of the pressure collector from the State Water Supply and Sewage System on Gonty Street to the sewage treatment plants on Kyivska Street in the city of Starokostyantyniv, Khmelnytskyi region

Idea

Reconstruction of the pressure collector from the State Water Supply and Sewage System on Gonty Street to the sewage treatment plants on Kyivska Street in the city of Starokostyantyniv, Khmelnytskyi region

Idea
TC: Starokostyantynivska urban hromada
Territorial community (Customer): Starokostyantynivska urban hromada
Partner executor: ВИКОНАВЧИЙ КОМІТЕТ СТАРОКОСТЯНТИНІВСЬКОЇ МІСЬКОЇ РАДИ

Total project budget

171 691 397 UAH

Project goal: The purpose of this project is:
to ensure sustainable development to meet the needs of the population and the economic complex for centralized water drainage;
to reduce energy consumption;
to prevent the occurrence of an emergency;
to reduce the negative impact on the environment
The project provides for the replacement of existing pipes with polyethylene PE-100 SDR 21 with a diameter of 500 mm, when crossing highways, the use of metal pipe casings with a diameter of 630 mm and the construction of new switching chambers is envisaged.
The length of the sewer collector to be reconstructed is 9709.34 m, the work will be performed by the open method of 562.2 m, by the horizontal drilling method of 1072.7 m, and by the rehabilitation method of 8074.44 m.
The chambers will be equipped with shut-off valves from the Hawle company.