Reconstruction of the water supply network with a diameter of 300 mm (duke) of the Pashkivsky water intake in the city of Starokostyantyniv, Khmelnytskyi region.
Reconstruction of the water supply network with a diameter of 300 mm (duke) of the Pashkivsky water intake in the city of Starokostyantyniv, Khmelnytskyi region.
Total project budget
3 894 565 UAH
Project goal: The main goal of the project is to provide consumers with high-quality drinking water, guarantee uninterrupted water supply and reduce the level of wear and tear of the water supply system infrastructure. The goal of the project is achieved by performing the following tasks: replacing old and worn-out pipes with modern polyethylene ones; reducing water losses during its transportation through the network; improving the overall quality of drinking water and sanitary and environmental safety; increasing the reliability of the entire system and optimizing water pressure.