Digital platform for civic engagement in European integration:
Khmelnytska oblast

Projects

Filters

Date
Project status
Community
EU Funds (Donors)
Idea
Start date: 01.12.2025

Reconstruction of the building of the specialized secondary school of grades I-III No. 7 of the city of Khmelnytskyi for the construction of a civil defense facility at 33 Zavodska Street in the city of Khmelnytskyi (correction)

The purpose of the project is to build an underground dual-purpose civil defense protective structure with the properties of a P1 group radiation shelter (with the highest level of protection for this type of shelter), as well as an above-ground workshop building for the Municipal Institution of General Secondary Education "Gymnasium No. 30" of the Khmelnytskyi City Council.

The goal is to achieve this goal by reconstructing the building with the arrangement of a civil defense structure, which includes the construction of an underground dual-purpose civil defense protective structure with the properties of a P1 group radiation shelter and the construction of an above-ground workshop building. In peacetime, the facility can be used to conduct the educational process and meet the economic needs of the educational institution.
The shape of the building in plan is close to rectangular. Overall dimensions in axes 1–7, A–M are 23.0 × 35.4 m.
The entrance to the radiation shelter is provided from the ground surface through pit stairs, and the entrance to the workshop is through entrance porches.
The height of the underground part (PRU) is 3.06 m, the height of the first floor of the workshop is 3.8 m.
The calculated capacity of the shelter is 382 people.

Idea
Start date: 01.12.2025

New construction of external power supply networks of the Khmelnytskyi Industrial Park on Vinnytsia Highway, 18 in the city of Khmelnytskyi

The purpose of the project "New construction of external power supply networks of the Khmelnytskyi industrial park on Vinnyts'kyi highway, 18 in the city of Khmelnytskyi" is to create a reliable, modern and sufficiently powerful electrical infrastructure that will ensure the launch, stable operation and development of industrial, logistics and innovative enterprises on the territory of the industrial park.
Ensuring power supply is a key condition for the formation of a full-fledged industrial environment and attracting investors. The creation of an appropriate infrastructure will support the development of high-tech industries, increase the investment attractiveness of the territory and create the prerequisites for the economic growth of the city of Khmelnytskyi.

Idea
Start date: 01.12.2025

New construction of external water supply and sewage networks of the Khmelnytskyi Industrial Park at 18 Vinnytske Shosse St. in the city of Khmelnytskyi

The purpose of the project "New construction of external water supply and sewage networks of the Khmelnytskyi Industrial Park" is to create the necessary engineering infrastructure for the functioning of the industrial park and to ensure conditions for the development of industry, innovative entrepreneurship and investment attraction in the city of Khmelnytskyi. The creation of the Khmelnytskyi Industrial Park allows for the formation of new points of economic growth in the city and to concentrate development in priority industries where there are sustainable competitive advantages and global development trends are being formed. It is expected that the park will become a modern platform for the emergence of high-tech industries, innovation clusters and business ecosystems that will contribute to the inclusive and sustainable development of the city's economy.

Idea
Start date: 15.10.2025

Construction of a sewage pumping station and two pressure collectors with sewage and water supply networks (Zakhidno-Okruzhna St. - S. Bandery St.)

Ensuring reliable and uninterrupted water drainage and water supply to residential areas in the Zarichia microdistrict in the city of Khmelnytskyi by constructing a sewage pumping station, pressure collectors, and engineering infrastructure networks.

Idea
Start date: 15.10.2025

Construction of a gravity and pressure collector and a sewage pumping station with a capacity of 1,500 cubic meters/day in the residential area "Leznevo 1, 2" in the city of Khmelnytskyi (adjustment)

To provide centralized sewage for residents of the residential area and improve the environmental situation in the area.

Idea
Start date: 15.10.2025

New construction of a railway crossing in the continuation of Starokostyantynivske highway in the city of Khmelnytskyi

Ensuring safe and uninterrupted transport connections via railway to improve population mobility and develop urban infrastructure.

Idea
Start date: 15.10.2025

New construction of a road from the junction between Sichovyh striltsiv St. and Hetmanska St. in Khmelnytskyi

Ensuring high-quality and safe transport connections between Sichovyh Striltsiv and Hetmanska streets in the city of Khmelnytskyi by building a new thoroughfare, which will contribute to improving traffic organization and increasing transport accessibility

Idea
Start date: 15.10.2025

New construction of the road from Sichovyh striltsiv Street to Hetmanska Street in Khmelnytskyi

Ensuring high-quality, safe and uninterrupted transport connections between Sichovyh striltsiv Street and Hetmanska Street in the city of Khmelnytskyi by building a new thoroughfare with proper engineering and pedestrian and bicycle infrastructure.

Idea
Start date: 15.10.2025

New construction on Hetmanska Street in Khmelnytskyi

Ensuring proper conditions for safe and comfortable movement of the population through the construction of new street and road infrastructure, which will contribute to the development of the city's transport network, improve connections between residential areas, and increase the level of improvement of the territory.

Idea
Start date: 14.10.2025

Major overhaul of part of the internal power supply system with the installation of renewable energy sources in the building of polyclinic No. 3, 16 Mayborskoho St., Khmelnytskyi

Generating your own electricity to reduce electricity costs, ensure energy independence, and reduce environmental impact through the use of clean, renewable energy.

Idea
Start date: 13.10.2025

Construction of the Ice Palace, 7/3A Prybuzka St., Khmelnytskyi

Providing the city's population with high-quality and accessible sports infrastructure by building a modern ice arena for training, sports competitions, mass skating and leisure

In implementation
Start date: 13.10.2025

Major renovation of part of the swimming pool building of the Khmelnytskyi Regional Center for Physical Education of Schoolchildren

The goal of the pool reconstruction is not only to update the building, but also to create a modern sports space that will contribute to the development of youth, sports, and the community as a whole.

Date
Project status
Community
EU Funds (Donors)