Digital platform for civic engagement in European integration:
Khmelnytska oblast

Projects

Filters

Date
Project status
Community
EU Funds (Donors)
Idea
Start date: 30.10.2025

Major repairs of the drainage system of the MKK microdistrict in the city of Horodok

It is planned to carry out a major overhaul of the existing network by laying a gravity sewer, which will allow saving electricity used by sewage pumping stations and ensuring the sanitary and epidemiological well-being of the population.
The construction of new networks is planned with PVC pipes. The diameter of the pipes is taken according to the calculation of 100-300 mm. The average depth of laying the pipes is 1.5 - 2.5 m. The use of PVC pipes in the construction guarantees increased (up to 50 years) durability of its operation and reduces the risk of the need for emergency work.
Discharge is planned to the existing sewage treatment plant, or when implementing a gravity network to the existing well. Water supply is provided from the existing water supply network.

Idea
Start date: 23.10.2025

Reconstruction of a complex of buildings for a palliative care department (Hospice) in the village of Lisovody

Creating conditions that will improve the quality of care for patients with incurable diseases and their family members. This will be achieved by opening an inpatient department of palliative (hospice) care on the basis of the municipal institution "'Horodok City Multidisciplinary Hospital'', which has a separate five-story building with an area of 5263.3 sq. m. in the village of Lisovody, located 14 km from the city of Horodok, after its reconstruction. The bed fund will be 54 beds. The implementation of the idea will ensure the highest possible quality of life for patients. Also, after the opening of the department, it is possible to create about 30 jobs. The project provides for 1- and 2-bed wards with a gateway, built-in wardrobes and sanitary facilities. 10 wards will be located on one floor, of which 2 wards are single, 8 wards are double. The first floor of the project includes a corridor, a reception area, a lobby, a cloakroom for visitors, doctors' and medical staff's offices, diagnostic and laboratory rooms, a pharmacy. The second floor has double rooms - wards for overnight stays of relatives and volunteers, a conference room, office rooms. Floors 3-5 - a palliative care department.

Idea
Start date: 16.10.2025

New construction of a dual-purpose building with the protective properties of an anti-radiation shelter and educational facilities with the reconstruction of the building of building No. 2 of the Gorodotsky Lyceum No. 1

As a result of the project implementation, the following will be achieved:
- the building area has been increased from 1022 sq.m. to 3253 sq.m.
- a radiation shelter for 600 people has been built;
- the number of educational facilities that meet the needs of organizing a high-quality educational process has been increased, in particular, an assembly hall, a gym, and a catering unit have been built;
- the heating and ventilation systems have been overhauled, the building has been provided with water supply and sewage, a fire alarm system, lightning protection, and an alert system have been installed;
- energy-efficient building measures have been implemented.

In implementation
Start date: 30.09.2025

New construction of a solar power plant to provide an alternative power source for the own needs of the Horodotska MBL

Providing the Horodot City Hospital with an autonomous source of electricity supply by installing a solar power plant with a total capacity of 150 kW.

In implementation
Start date: 25.09.2025

Major repairs of the drainage system of the MKK microdistrict in the city of Horodok

Providing a sewage network to subscribers of the MKK microdistrict of the city and preventing environmental pollution

In implementation
Start date: 20.01.2025

Major repairs of the sewer network on Zavodska Ploshcha Street, Horodok, Khmelnytskyi District, Khmelnytskyi Region

Providing a sewage network to subscribers of two microdistricts of the city and preventing environmental pollution

In implementation
Start date: 16.01.2025

Reconstruction of a complex of buildings for a palliative care department (Hospice) in the village of Lisovody

Creating conditions that will improve the quality of care for patients with incurable diseases and their family members

In implementation
Start date: 19.12.2024

Major repairs of the bridge on the local public road O230405 Trostyanets - (Varivtsi - Victoria station) between Basivka km 5+565, L=6m

Ensuring safe passage over the road bridge

In implementation
Start date: 29.05.2024

Reconstruction of the internal networks of the heating system of the building of the Horodotsk elementary school

Implementation of this project will allow the school to switch to an alternative type of heat, reduce natural gas consumption, and create comfortable conditions for children to stay in the institution.

In implementation
Start date: 27.05.2024

Reconstruction of the basement with the installation of an anti-radiation shelter of the building of the support institution of Horodotsky Lyceum No. 2

Safe stay of the participants of the educational process during air alarms in the educational institution

In implementation
Start date: 24.05.2024

Reconstruction of part of the premises for the dining room and food block of the support institution of Horodotsky Lyceum No. 2

Creation of conditions for full-fledged, high-quality nutrition of students by arranging and implementing modern technologies in the field of nutrition and ensuring compliance with the principles of HACCP.

In implementation
Start date: 25.04.2024

New construction of a protective structure of civil defense on the territory of Horodotsky Lyceum No. 4

Creation of comfortable and safe conditions for the participants of the educational process in the educational institution, compliance with the relevant norms of the functioning of protective structures

Date
Project status
Community
EU Funds (Donors)