Projects
Filters
The new construction of the protective structure of the civil protection - anti-radiation shelter (PRU) of the Kamianets-Podilskyi Lyceum No. 13 on the street. Ivan Mazepa, 5 in the city of Kamianets-Podilskyi, Khmelnytskyi region
Creating safe conditions for students, teachers and staff of the lyceum during emergencies by building a modern civil defense protective structure - a radiation shelter (PRU), which will provide reliable protection against radiation damage and other dangerous factors. The project is a priority for implementation and a priority for the community, since there is an urgent need to increase the network of civil defense structures.
New construction of a water intake well for water supply needs of the Khodorovets Lyceum at the address: village Khodorovtsi, str. Shkilna, 15, Kamianets-Podilsky district, Khmelnytskyi region
The main purpose of the project is to provide water for the needs of the Khodorovets Lyceum, located at: village Khodorovtsi, Shkilna Street, 15, Kamianets-Podilskyi District, Khmelnytskyi Region. Currently, the Lyceum is supplied with water from an existing mine well, which after drilling the well will remain a reserve source of water supply. The project involves the construction of an 80 m deep water intake well to the Silurian aquifer.
The construction site is located within the elevated denudation-accumulative plain of the Volyn-Podilskyi Upland. Quaternary, Neogene and Silurian deposits are involved in the geological structure of the exploration area. Quaternary deposits are represented by loams with sand layers exposed up to 7 m. Neogene deposits are represented by clays with pebbles with sand layers, limestones with clay layers, sand exposed with a total thickness of up to 23 m. Silurian deposits are represented by limestones with mudstone layers. Groundwater lies at a depth of more than 3 m. The well is located on a flat area with a slight slope towards the Dniester. In geomorphological terms, it is located within the Volyn-Podilsky Upland, which is characterized by both a strongly wavy, sometimes convex, or flat surface, and the presence of valleys cut into a depth of more than 40 m. The general slope of the terrain from north to south, absolute elevations range from 200 m to 280 m. Modern physical and geological processes manifest themselves in the form of modern erosion (erosion), karst and landslides. Modern erosion processes sometimes lead to the formation of cliffs above river banks and the formation of ravines on the slopes of river valleys. The well is designed for water-pumping horizons of Silurian deposits, which are selected in accordance with clause 8.5. DSTU 4808:2007. These water pumping horizons are interlayer pressure waters, which are most protected from possible pollution, reliable in terms of water supply stability and mainly meet the hygienic requirements for drinking water intended for human consumption. The waters of the water pumping horizon are transparent, colorless and odorless, pleasant to the taste, slightly mineralized, the dry residue does not exceed 1.0 g/l, mainly 0.5-0.7 g/l. The waters are moderately hard, the total hardness varies from 2.6-11.0 mg.eq.
Good water quality and polyhydricity of this horizon allow it to be used for centralized water supply.
To preserve the drinking quality of water, as well as prevent pollution of the aquifer, in accordance with the current regulations on the procedure for designing and operating sanitary protection zones for water supply sources and water pipelines for domestic and drinking purposes, and Chapter DBN V.2.5-74:2013 "Water supply. External networks and structures", sanitary protection zones (ZSO) are established within the designed water intake, in which special measures are implemented to eliminate the possibility of contamination of the water intake and the aquifer in the area of the
water intake.
The total water requirement for water supply to the needs of the Khodorovets Lyceum at the address: village of Khodorovtsi, ul. Shkilna, 15, Kamianets-Podilskyi district, Khmelnytskyi region is up to 10 m3 / day. To meet this need, a well is designed for the Silurian aquifer:
- well depth – 80 m,
- expected flow rate – up to 4m3/h,
- initial well diameter – 168 mm,
- final diameter – 139.7 mm.
The well is equipped with a Pedrollo 4SR4/12F submersible pump with a 1.1 kW electric motor.
The project provides for annular cementing of a 168 mm diameter casing column from a depth of 31 m to 0 m, which prevents surface water and water from aquifers located above from entering the aquifers that will be operated directly near the well. To prevent depletion of aquifers, it is planned to monitor static and dynamic water levels during well operation.
The main works on this project include the following:
- preparatory work: construction of temporary buildings and structures, arrangement of temporary fencing of the construction site and access road;
- drilling of an artesian well;
- construction of a pumping station;
- installation of water lifting equipment and shut-off valves.
Barrier-free access in the hospital, installation of a lift in the main building of the hospital KNP "KP ML" KP MR
The goal of the project is to ensure unhindered access for patients with special needs, the elderly and people with temporary mobility limitations to the departments in the main building of the hospital.
It is planned: installation of a lift in accordance with accessibility standards (1 lifting device).
This will ensure equal access to medical services for everyone, regardless of their physical abilities (4,500 people).
Major overhaul of the heating system of ZDO No. 22 at 21 Molodizhna Street in Kamianets-Podilskyi, Khmelnytskyi region
Creating safe and comfortable learning and working conditions in an educational institution by modernizing the heating system, ensuring energy efficiency and reliability of engineering networks.
Major repairs of the heating system of Kamianets-Podilskyi Lyceum No. 15 at 17 Hrushevsky Ave. in Kamianets-Podilskyi, Khmelnytskyi region
Creating safe and comfortable learning and working conditions in an educational institution by modernizing the heating system, ensuring energy efficiency and reliability of engineering networks.
Reconstruction of an internal toilet with the arrangement of a bathroom for people with reduced mobility and a toilet for boys at the Kamianets-Podilskyi Special School of the Khmelnytskyi Regional Council, Pavla Skoropadskyi St., 20, Kamianets-Podilskyi, Khmelnytskyi region
ensuring unhindered access for persons with special needs to educational services
Installation of fire alarms in the dormitory and educational buildings of the Kamianets-Podilskyi Special School of the Khmelnytskyi Regional Council at the address: 20 P. Skoropadskoho St., Kamianets-Podilskyi, Khmelnytskyi Region
ensuring safe learning conditions for children with visual impairments in conditions of continued hostilities
Formation and development of medical and health infrastructure through the reconstruction of the medical diagnostic and advisory center at 30 I. Franka St. with the aim of creating a balneological resort
The goal of the project is to create a modern balneological resort on the basis of the existing medical diagnostic and advisory center through its reconstruction and modernization. The project is aimed at developing medical and health infrastructure, improving the quality of medical and health services, attracting tourist flows, improving the level of public health, as well as economic revitalization of the region.
Methods of achievement:
Conducting hydrogeological and sanitary epidemiological studies of mineral waters.
Completion of reconstruction of the existing facility.
Creation of modern medical departments for balneotherapy.
Introduction of modern medical and diagnostic technologies.
Installation of specialized installations for the use of mineral waters.
Implementation of a system of environmental monitoring of the use of natural resources.
Creation of package treatment and recreation programs.
Organization of service and tourism infrastructure.
Provision of personnel and training of personnel.
Marketing and popularization.
"Reconstruction of part of the non-residential premises of the dental clinic at 13 Stepana Bandera Street, room 131, with a total area of 408.7 sq. m. under the AZPSM and office premises of the KNP "Center for Primary Health Care" of the KPMR, in the city of Kamianets-Podilskyi, Khmelnytskyi region, including the production of PKD" (new edition)
The purpose of the public investment project "Reconstruction of a part of the non-residential premises of the dental clinic at 13 Stepana Bandera Street, room 131, with a total area of 408.7 sq. m" under the AZPSM and office premises of the KNP "Center for Primary Health Care" of the KPMR, in the city of Kamianets-Podilskyi, Khmelnytskyi region, including the production of PKD" is:
Creation of a functional, accessible and modernly equipped general practice - family medicine outpatient clinic (AZPSM) to provide primary medical care to residents of the Kamianets-Podilskyi urban territorial community;
Ensuring proper working conditions for the medical staff of the KNP "Center for Primary Health Care" of the KPMR;
Rational use of existing municipal property through the reconstruction of unused or inefficiently used premises;
Improving the quality and accessibility of medical services provided to the population at the primary level of care health.
Reconstruction of the non-residential building of the offset shop for office, administrative premises, premises of the exhibition hall, workshop and catering establishment (business center), Polsky Rynok Square, 2
The project aims to stimulate the sustainable development of small and medium-sized businesses in the community by investing in physical and intangible infrastructure, creating a favorable business environment for the creative, tourism and agricultural sectors, introducing innovations and digital technologies, developing business networks and clusters, as well as attracting investments and promoting the region as an attractive center for business and tourism.
To achieve this goal, the project implements a set of investment and organizational measures, including:
-Development of physical infrastructure (reconstruction of the dilapidated building of the former printing house in the historic center of the city; arrangement of a multifunctional space: coworking, conference rooms, art studios, tourist information center, library-cafe and local goods store)
- Creation of digital services and innovative tools (launch of an online marketplace for selling products of local producers; creation of information and analytical portals for tourism, agro-processing, maps of vacant lands)
- Educational and consulting programs (conducting business trainings, master classes, internships, study visits; providing consultations on legal, financial and marketing issues; development of innovative entrepreneurship and digital competencies)
- Development of business networks and clusters (creation and support of tourism, agro-processing and creative clusters; organization of forums, exhibitions, fairs, business meetings and Maker Faire; formation of new partnerships and joint products in priority sectors)
- Marketing and promotion of the community (conducting advertising campaigns and developing tourist packages; forming a positive investment image of the community at the national and international levels)
Today, the Kamianets-Podilskyi community lacks a modern economic development center that would provide comprehensive support for entrepreneurs, creative industries and tourism businesses. The existing infrastructure does not meet modern requirements: the building of the former printing house is in a state of emergency (4th category of technical condition), which makes it impossible to use it without reconstruction; there is a lack of digital services for promoting local products and investing; entrepreneurs do not have access to regular training, mentoring and business analytics; there are no effective platforms for combining businesses into clusters and establishing value-added chains.
The implementation of the project will bridge this gap, ensuring a transition from a fragmented and outdated infrastructure to an innovative ecosystem of business development and investment, which will increase the investment attractiveness of the community, contribute to the creation of new jobs and the growth of the local budget.
Major repairs of premises (with elimination of roof damage) in the production workshops of the Kamianets-Podilskyi Lyceum with enhanced military and physical training of the Khmelnytskyi region at 41v Hrushevskoho Avenue, Kamianets-Podilskyi, Khmelnytskyi region (Correction)
Ensuring a high-quality and worthy educational process for future defenders of Ukraine
Major renovation of educational and practical premises of the Scientific and Technological Research Center "Technocenter" of the Institution of Professional (Vocational and Technical) Education "Podilskyi Professional College"
- ensuring uninterrupted access of individuals to educational services
- creating a modern platform for training highly qualified specialists in the field of maintenance and repair of wheeled vehicles
- rational use of existing unused areas of the educational institution