Digital platform for civic engagement in European integration:
Khmelnytska oblast

Projects

Filters

Date
Project status
Community
EU Funds (Donors)
Idea
Start date: 24.10.2025

Major repairs of the road on Prosvita Street from Myru Avenue to Ukrainska Street in Shepetivka, Khmelnytskyi Region

Major repairs of the road surface for the purpose of normal pedestrian and vehicle traffic

Idea
Start date: 24.10.2025

Provision of high-quality, modern and affordable general secondary education "New Ukrainian School"

Idea
Start date: 23.10.2025

Major renovation of the department of inpatient palliative medical care for adults and children of the KNP "Izyaslavska MBL" at 47 B. Khmelnytskyi St., Izyaslav

Creation of a modern, comfortable, safe and barrier-free medical space for the provision of palliative care by carrying out a major renovation of the department premises with the replacement of engineering networks, insulation, renovation of decoration and arrangement in accordance with state standards.

Idea
Start date: 23.10.2025

New construction of a water supply system on Vaskovetska Street, B. Khmelnytskyi Avenue in the city of Izyaslav

providing access to drinking water to the population of a certain area of the city

Idea
Start date: 23.10.2025

Major repairs to the catering unit of the KNP "Izyaslavska MBL" at 47 B. Khmelnytskyi St., Izyaslav

Providing safe, sanitary and energy-efficient conditions for preparing food for hospital patients by carrying out major repairs in the thoracic unit premises with the replacement of communications, insulation, modernization of ventilation and renovation of the internal arrangement.

Idea
Start date: 23.10.2025

Installation of solar panels at the Bilogirsk Multidisciplinary Hospital

The goal of the project is to increase the energy efficiency and energy independence of the Bilogirska Multidisciplinary Hospital by installing a system of ground-mounted solar panels to ensure a sustainable power supply to the medical facility.

Idea
Start date: 23.10.2025

Major renovation of part of the building - the dining block of the Netishyn comprehensive school of grades I-III No. 4 (Netishyn gymnasium "Energy") of the Netishyn city council of the Khmelnytskyi region at the address: Energetikov st., building 3, Netishyn, Khmelnytskyi region

Creating comfortable conditions for organizing proper and rational nutrition for students and employees of the educational institution. Arrangement of sanitary and hygienic conditions for nutrition, food safety in accordance with the HACCP system. Ensuring energy efficiency of the educational institution.

Idea
Start date: 23.10.2025

Major repairs of part of the group of premises "Civil defense protective structure (radiation shelter No. 86158), at the address: Khmelnytskyi region, Shepetivskyi district, Netishyn city, Heroes of Ukraine avenue, 1, group of premises No. 916"

The project was developed to restore operational performance, ensure the protection of participants in the educational process and the population from dangerous factors of emergencies and organize the life support of the building (structure, premises) and bring it into compliance with the basic requirements according to DBN V.2.2-5:2023.

Idea
Start date: 23.10.2025

Providing a general secondary education institution with teaching aids and equipment within the framework of the implementation of the "NUSH" reform

Organization of a modern educational environment for students in accordance with the concept of the New Ukrainian School by purchasing furniture, teaching materials and digital equipment.
Methods of achieving the goal: Purchase of modern furniture: mobile desks, chairs, cabinets, areas for group work and recreation. Equipping classrooms with interactive panels, laptops, printers.
Justification of the gap between the current state and the planned result: There is no mobile furniture, interactive equipment.
The planned activities will allow: Provide students with a modern educational space. Improve the quality of the educational process and student motivation.

Idea
Start date: 23.10.2025

New construction of the protective structure of the civil protection anti-radiation shelter on the territory of the Burtyn gymnasium at the address: Peremogy street, building 69-a, Burtyn village, Shepetivskyi district, Khmelnytskyi region

Project goal:
Increasing the level of safety of participants in the educational process by creating a modern protective structure capable of providing shelter for all students, teachers and staff during emergencies of a peaceful and military nature.
Methods of achieving the goal:
- construction of an anti-radiation shelter in accordance with the requirements of the State Code of Civil Protection and Civil Protection Standards;
- equipping the structure with ventilation, lighting, sanitary and technical units, communications and backup power supply;
- ensuring barrier-free access for low-mobility population groups;
- conducting exercises and training on evacuation and use of the protective structure;
- interaction with the State Emergency Service to monitor the readiness of the facility for operation.

Idea
Start date: 23.10.2025

Reconstruction of a complex of buildings for a palliative care department (Hospice) in the village of Lisovody

Creating conditions that will improve the quality of care for patients with incurable diseases and their family members. This will be achieved by opening an inpatient department of palliative (hospice) care on the basis of the municipal institution "'Horodok City Multidisciplinary Hospital'', which has a separate five-story building with an area of 5263.3 sq. m. in the village of Lisovody, located 14 km from the city of Horodok, after its reconstruction. The bed fund will be 54 beds. The implementation of the idea will ensure the highest possible quality of life for patients. Also, after the opening of the department, it is possible to create about 30 jobs. The project provides for 1- and 2-bed wards with a gateway, built-in wardrobes and sanitary facilities. 10 wards will be located on one floor, of which 2 wards are single, 8 wards are double. The first floor of the project includes a corridor, a reception area, a lobby, a cloakroom for visitors, doctors' and medical staff's offices, diagnostic and laboratory rooms, a pharmacy. The second floor has double rooms - wards for overnight stays of relatives and volunteers, a conference room, office rooms. Floors 3-5 - a palliative care department.

Idea
Start date: 22.10.2025

New construction of a local automated centralized alert system in settlements of Izyaslav urban territorial community, Shepetivsky district, Khmelnytsky region

creation of a centralized system for alerting residents of settlements of the territorial community by installing centrally controlled alert base stations in key settlements

Date
Project status
Community
EU Funds (Donors)