Digital platform for civic engagement in European integration:
Khmelnytska oblast

Projects

Filters

Date
Project status
Community
EU Funds (Donors)
Idea
Start date: 28.10.2025

Reconstruction of a dormitory for a multi-apartment residential building at 108 M. Mykytyuka St. in Izyaslav

reconstruction of a dormitory into an apartment building, redevelopment, internal and external repairs

Idea
Start date: 28.10.2025

Reconstruction of the Izyaslav Youth School stadium at 11 Vokzalna Street in Izyaslav

Reconstruction of the Izyaslav Youth School stadium

Idea
Start date: 28.10.2025

Improving energy efficiency and energy security of the water pumping station and partial reconstruction of existing water supply networks in the city of Krasyliv

Improving energy efficiency, energy security and reliability of the water supply system of the city of Krasyliv.

Idea
Start date: 27.10.2025

New construction of a protective structure (radiation shelter) in Shepetivka educational complex No. 3 as part of the "N. Rybak Secondary School of I-III Degrees and Lyceum with Enhanced Military-Physical Training" of the Khmelnytskyi region at the address: Shepetivka, Ukrainka St., 67

Preservation of the life and health of students during the educational process in full

Idea
Start date: 27.10.2025

Major repairs of the road from Heroes of Azov Square to the entrance to the Shepetivka Park of Culture and Recreation in the city of Shepetivka, Khmelnytskyi region

Creating comfortable conditions for community residents to relax

Idea
Start date: 27.10.2025

Providing secondary education institutions with teaching aids and equipment within the framework of the implementation of the “New Ukrainian School” reform

The key goal of the New Ukrainian School is to create a modern, accessible and inclusive educational system that will ensure the comprehensive development of a child as a personality, patriot, innovator and responsible citizen. The main emphasis is shifted from the acquisition of knowledge to the acquisition of competencies that allow them to successfully realize themselves in life and in conditions of constant change. To put the student's personality, his interests and potential at the center of the educational process. Improving the qualifications and motivation of teachers, as well as updating the educational environment to make it modern and attractive. The purchase of equipment for the New Ukrainian School (NUS) is critically important for the implementation of the main goal of the reform - the creation of a modern, innovative and child-centered educational system. Without proper material and technical support, it is impossible to implement new teaching methods and develop key competencies in students. Modern equipment, in particular multimedia complexes, computer technology and digital laboratories, helps to develop information and communication and digital competencies. Thanks to such equipment, students learn to work with information, use technology, and prepare for life in a digital society. Thus, the purchase of equipment for NUS is an investment in the future, ensuring the successful implementation of educational reform and training a new generation of competent and responsible citizens.

Idea
Start date: 27.10.2025

Installation of a modular shelter for 300 people in Slavutysk Gymnasium No. 3 of the Slavutysk City Council at 2A Maria Lysenko Street, Slavutysk, Khmelnytskyi region.

Ensuring the safe stay of students and staff during an air raid by installing an autonomous modular shelter for 300 people that meets state construction and sanitary standards, and increasing the resilience of the educational process to emergencies.

Idea
Start date: 27.10.2025

Major repairs (thermal modernization) of the building of Krasyliv Gymnasium No. 4 named after P. Kizyun of the Krasyliv City Council of the Khmelnytskyi region at the address Khmelnytskyi region, Khmelnytskyi district, Krasyliv, Shkilna st., 8

The main goal of the thermal modernization project is to increase the energy efficiency of buildings to reduce energy consumption and utility costs, which also leads to improved comfort, increased safety, reduced greenhouse gas emissions, and strengthened energy independence of the state. This is achieved through comprehensive measures for insulation, window replacement, modernization of engineering systems, and other energy saving works.

Idea
Start date: 27.10.2025

Major repairs (thermal modernization) of the building of the Krasyliv Lyceum of the Krasyliv City Council of Khmelnytskyi region at the address: Khmelnytskyi region, Krasyliv city, Centralna st., 38 A

The goal of the project is to increase the energy efficiency of the Krasyliv Lyceum building, reduce heating costs, and improve the living conditions of students and employees by carrying out comprehensive thermal modernization measures.
Main tasks:
Reducing heat loss through external structures.
Increasing the energy efficiency of the heating system and energy saving.
Ensuring a comfortable temperature regime in the premises.
Reducing greenhouse gas emissions and improving the environmental situation.
Creating a safe, modern, and aesthetic facade of the educational institution.

Idea
Start date: 24.10.2025

Major renovation of the building (dining room) of the Izyaslav Lyceum No. 2 named after O. Kushniruk of the Izyaslav City Council, at 4 O. Kushniruk St., Izyaslav, Shepetivskyi district, Khmelnytskyi region

The need to prepare design and estimate documentation is due to the need for major repairs
due to the fact that the catering unit has not been overhauled for a long time, the plumbing equipment has broken down and is not suitable for use, there is an urgent need to carry out major repairs and redevelopment of the delivery and consumption area (dining hall), replace technological equipment, ventilation system, walls, ceiling.
When preparing design and estimate documentation, it is necessary to take into account the priority requirements based on the principles of the Food Safety Management System (HACCP)" and compliance with legislative regulatory documents, namely the Law of Ukraine No. 771 "On the Basic Principles and Requirements for the Safety and Quality of Food Products" (Articles 20, 21); Order of the Ministry of Agrarian Policy and Food of Ukraine No. 590 dated 01.10.2012 “On approval of the Requirements for the development, implementation and application of permanent procedures based on the principles of the Food Safety Management System (HACCP).

Idea
Start date: 24.10.2025

Major renovation of the therapeutic building of the KNP "Izyaslavska MBL" (facade insulation) at 47 B. Khmelnytskyi St., Izyaslav

Increasing the energy efficiency of the hospital's therapeutic building, improving the conditions for patients and medical staff, reducing costs for heating and energy resources. Insulation of the facade with mineral wool boards, replacing windows and doors with energy-saving ones, updating drainage systems, arranging a drainage system, painting the facade with modern materials with increased weather resistance.

Idea
Start date: 24.10.2025

Major renovation of the premises of the second floor of the rehabilitation department for the treatment and rehabilitation of military personnel in the building of the hydrotherapy clinic of the KNP "Shepetivska Multidisciplinary Hospital", Khmelnytskyi region, Shepetivka, 85 Zahisnyky Ukrainy St.

Improving the quality of rehabilitation services, which will contribute to faster and more effective recovery of patients after injuries, operations, strokes, as well as improving the quality of life of people with chronic diseases. Ensuring safe and comfortable conditions for patients, taking into account the needs of people with disabilities and low-mobility population groups. Reducing social tension associated with the lack of proper conditions for restoring health, especially in regions where access to quality rehabilitation is limited. The method of achievement is the implementation of construction and installation works for major repairs.

Date
Project status
Community
EU Funds (Donors)