Digital platform for civic engagement in European integration:
Khmelnytska oblast

Projects

Filters

Date
Project status
Community
EU Funds (Donors)
Idea
Start date: 31.10.2025

Major repairs of the civil defense building (protective structure of civil defense (anti-radiation shelter) registration number 86156), at the address: Shevchenko St., building 14A, Netishyn, Shepetivskyi district, Khmelnytskyi region for Preschool Education Institution No. 6 "Veselka" of the Netishyn City Council

The purpose of implementing this project is: - to ensure uninterrupted access of preschool children to educational services; - to ensure a safe educational process for preschool children and preschool education institution employees. Currently, preschoolers are forced to take shelter in a shelter that is not adapted and does not meet modern norms, standards and rules, namely: there is no accessibility for low-mobility groups, outdated plumbing equipment, electrical equipment, ventilation, etc., it needs to be equipped with the necessary premises, zones, and fire protection upgrades. The project provides for bringing the existing shelter into compliance with the latest norms, standards and rules, making it convenient, comfortable, safe, and energy-efficient.

Idea
Start date: 31.10.2025

Major repairs of the adjacent territory of Izyaslav Lyceum No. 5 named after O.P. Onyshchuk of the Izyaslav City Council, 4 Nezalezhnosti Street, Izyaslav, Shepetivskyi district, Khmelnytskyi region

Lyceum No. 5 named after O. P. Onyshchuk is a supporting institution and plays an important role in shaping the educational environment of the community. In order to provide children with quality education and create a modern educational environment, major repairs and improvements to the surrounding area, which includes a sports field, are planned. To create proper conditions for children to stay in this educational institution, there was a need to prepare design and estimate documentation for the purpose of further major repairs.

Idea
Start date: 30.10.2025

Major repairs (insulation of the building facade) of the Radoshiv Lyceum of the Izyaslav City Council, Khmelnytskyi region, 3 Tsentralna Street, in the village of Radoshivka, Shepetivskyi district, Khmelnytskyi region

Insulation of part (uninsulated) of the external facade of the building of Radoshivska Secondary School 1st-3rd grades.

Idea
Start date: 30.10.2025

Major overhaul of the heating system of Izyaslav Primary School No. 7 of the Izyaslav City Council at the address: Mykola Mykytyuk St., building 106, Izyaslav, Shepetivskyi district, Khmelnytskyi region

Major overhaul of the heating system by replacing worn-out communication connections, etc.

Idea
Start date: 30.10.2025

Major repairs (thermal modernization) of the building of the educational institution "Secondary school of the 1st degree - combined type nursery-kindergarten No. 6" at 2 Gorynskyi Street in the city of Izyaslav, Izyaslavsky district, Khmelnytsky region (corrections)

Increasing the energy efficiency of the building by insulating the main building envelope. The accompanying works are designed to protect the insulation structures from precipitation and bring the building to an aesthetic architectural appearance.

Idea
Start date: 30.10.2025

Providing high-quality, modern and accessible general secondary education "New Ukrainian School" at Lyceum No. 3

Lyceum No. 3 requires modernization of the material and technical base for the implementation of the New Ukrainian School (NUS) reform. The main goal is to improve the quality of the educational process by introducing innovative technologies, developing the digital competence of students and teachers, as well as ensuring comfortable and safe learning conditions.
The goal of the project is to equip 5 classrooms (138 students) with interactive means (panels and multimedia, teaching aids and equipment) to ensure high-quality, modern and accessible education, in accordance with the requirements of the State Standard of Basic Secondary Education.
Interactive panels and multifunctional devices will contribute to the intensification of learning, improving the quality of education, reducing teacher training time and creating a digital inclusive environment.
Implementation of the principles of the New Ukrainian School: child-centeredness, partnership, integrated learning.
Main tasks:
 Equipping classrooms with modern equipment for the effective use of interactive and multimedia technologies.
 Support for distance and blended learning through the use of digital devices.
 Improvement of the material and technical base of the lyceum to implement a competency-based approach to learning.
Procurement within the framework of the project
1. Interactive panels
Intended for use during lessons, provide interactive interaction between the teacher and students, the ability to demonstrate educational content, use electronic textbooks, conduct interactive exercises, contribute to the development of critical thinking, communication and creativity of students.
2. Multifunctional devices (MFPs)
Provide printing, copying and scanning of educational materials necessary for organizing the educational process, are used to prepare didactic materials, test tasks, handouts for students.
3. Educational equipment
Includes technical equipment necessary for conducting laboratory work, experiments, demonstrations in natural and mathematical disciplines. Increases the practical orientation of learning, forms research skills in students.
Expected results

 Creation of a modern educational space in the lyceum.
 Increasing students' motivation to learn through the use of interactive methods.
 Improving the quality of educational services and the level of digital competence of teachers.
 Implementation of the principles of the New Ukrainian School in the practical activities of the institution.
Expected effect
The implementation of the project will contribute to the formation of an environment in which learning will be interesting, modern and practically oriented. Students will be able to more effectively acquire knowledge, and teachers will be able to apply innovative methods and digital resources in their daily work.

In implementation
Start date: 30.10.2025

Major renovation of part of the Lenkovets Lyceum dining room building at the address: Shkilna St., 2a, Lenkivtsi village, Shepetivskyi district, Khmelnytskyi region

Providing hot meals to students in accordance with HACCP requirements and Sanitary Regulations. Ensuring proper nutrition conditions for students of the educational institution. Improving the organization of technological processes for preparing meals, transition to healthy eating, ensuring proper hygiene of the

Idea
Start date: 30.10.2025

Major repairs of the drainage system of the MKK microdistrict in the city of Horodok

It is planned to carry out a major overhaul of the existing network by laying a gravity sewer, which will allow saving electricity used by sewage pumping stations and ensuring the sanitary and epidemiological well-being of the population.
The construction of new networks is planned with PVC pipes. The diameter of the pipes is taken according to the calculation of 100-300 mm. The average depth of laying the pipes is 1.5 - 2.5 m. The use of PVC pipes in the construction guarantees increased (up to 50 years) durability of its operation and reduces the risk of the need for emergency work.
Discharge is planned to the existing sewage treatment plant, or when implementing a gravity network to the existing well. Water supply is provided from the existing water supply network.

Idea
Start date: 30.10.2025

Major renovation of the two-story building of the preschool educational institution of the child development center "Kalynonka" on Heroiv Krut St., building 5 in the village of Letychiv, Khmelnytskyi district, Khmelnytskyi region

Ensuring uninterrupted access to educational services

Idea
Start date: 29.10.2025

Major renovation of the gymnasium of the Mykhniv Lyceum of the Izyaslav City Council at 3 Myru St., Mykhniv village, Shepetivsky district, Khmelnytsky region

renovation with thermal insulation of the premises with replacement of the heating system, floor and roof repair, interior renovation

Idea
Start date: 29.10.2025

Major repairs of Kozatskaya Street in Izyaslav, Shepetivsky District, Khmelnytskyi Region

major repairs of a street with asphalt-concrete pavement

Idea
Start date: 29.10.2025

New construction of a civil protection protective structure (anti-radiation shelter) on the street. Chornovola, Netishyn city, Netishyn city territorial community, Shepetiv district, Khmelnytskyi region

The purpose of implementing this project is:
- ensuring uninterrupted access of preschool children to educational services;
- ensuring a safe educational process for preschool children and preschool education institution employees.

Date
Project status
Community
EU Funds (Donors)