Digital platform for civic engagement in European integration:
Khmelnytska oblast

Projects

Filters

Date
Project status
Community
EU Funds (Donors)
Idea
Start date: 20.12.2025

New construction of modern sewage treatment facilities for domestic and commercial wastewater, Khmelnytskyi city, Vinnytske Shose St., 135

Treatment plants will ensure the proper quality level of timely wastewater treatment. As a result, it will prevent irreparable pollution of water bodies and soil, groundwater. This is important for the ecology and will also affect flora, fauna, human and animal health.

Idea
Start date: 20.12.2025

New construction of an underground warehouse for non-combustible materials and household equipment of the Ruzhychansky Lyceum

Providing safe conditions in institutions providing general secondary education

Idea
Start date: 19.12.2025

Reconstruction of the 1st floor of the therapeutic building at the address: Khmelnytskyi region, Khmelnytskyi district, Starokostyantynivska territorial community, Starokostyantyniv city, 47 Zahisnyky Ukrainy street

Idea
Start date: 19.12.2025

Modernization of the institution's material and technical base

Modernization of the MTB to bring the facility into line with modern standards of safety, functionality and efficiency. Methods of achievement: updating and replacing outdated equipment, retrofitting with modern technical means

Idea
Start date: 17.12.2025

New construction of water supply and sewage networks for the Zarichia microdistrict in Khmelnytskyi

New construction of water supply and sewage networks for the Zarichia microdistrict in Khmelnytskyi

Idea
Start date: 17.12.2025

"New construction of a protective structure for civil defense of an anti-radiation shelter on the territory of Starokostyantynivska Secondary School of I - III grades No. 1" (at the address: 40 Ostrozkogo St., Starokostyantyniv, Khmelnytskyi region)

Construction of a radiation shelter at school is an investment in the safety and well-being of students and employees. This is a necessary measure that meets modern safety requirements and standards, which helps to ensure a calm and confident future for all participants in the educational process. In addition, the preparation and use of radiation shelters in educational institutions allows you to maintain the continuity of the educational process even in difficult conditions. This contributes to maintaining stability in society and providing the future generation with the necessary knowledge and skills.

Idea
Start date: 17.12.2025

Reconstruction of the buildings of the property complex for the department of inpatient care and temporary stay No. 1 of the village of Gubcha at the address: Gubcha village, Sadova st., 1/1, Khmelnytskyi district, Khmelnytskyi region

The goal of the project is to comprehensively address the problem of the lack of proper infrastructure for proper care for persons in need. The implementation of the project is aimed at creating an inclusive environment that meets state building codes, barrier-free standards and modern requirements for the provision of social services. Achieving the goal of the project will ensure decent living conditions for persons and their care and maintenance, increasing the level of accessibility of social services. The goal is achieved by developing and implementing the PCD, carrying out relevant work.

Idea
Start date: 17.12.2025

Reconstruction of electrical networks by installing a solar power plant on the roof of the building of Lyceum No. 1 named after Hero of Ukraine M. Dzyavulskyi, Shepetivka city rally, Khmelnytsky region at the address: Khmelnytsky region, Shepetivka city, Prosvity st., building 61

The project aims to increase the reliability of electricity supply to Lyceum No. 1 of the Shepetivka City Council to ensure reliable and efficient electricity supply, in particular, through the use of renewable energy sources - solar panels. Savings and rational use of energy resources, reducing the load on electrical networks, reducing the need for thermal energy for heating.

Idea
Start date: 17.12.2025

Reconstruction of premises at 86 Nezalezhnosti Street in Volochysk with the arrangement of a youth space and a cinema hall with 50 seats

The goal of the project is to unleash the potential of young people who are eager for change and are ready to work to improve the quality of life in the community.
In the two-story building of the former cinema, it is planned to create a multifunctional location that should become a public place for creativity, communication and work.
It will allow for various events, meetings with graduates, discussions, co-working, creative activities and communications, training and gaming activities, relaxation and watching films, in particular:
-youth space and conference hall, where you can organize various educational activities;
- recording studio - the opportunity to learn how to create high-quality video content;
- a cinema for 50 spectators (lobby area, box office, wardrobe and restroom)
For accessibility to low-mobility segments of the population, it is planned to arrange an elevator cabin.

Idea
Start date: 16.12.2025

New construction of heating networks for the Zarechye microdistrict in Khmelnytskyi

Goal: ensuring heat supply to the new microdistrict "Zarichka" of Khmelnytskyi.
Method of achieving the goal: For centralized heat supply to the new microdistrict "Zarichka" of Khmelnytskyi, which is provided for by the development plan, the construction of main and distribution heat networks from the heat generation facility to the distribution point and throughout this microdistrict will be carried out.

Idea
Start date: 16.12.2025

Purchase of teaching aids (special means of correction of psychophysical development) for children with special educational needs who study in preschool educational institutions of the Starokostyantynivka urban territorial community.

The implementation of the project involves creating conditions for preschool education for children with special educational needs, taking into account their individual needs. The implementation of the project will allow children with special educational needs to use modern technical means of education in the educational process, improve the quality of the educational process, and create an inclusive and barrier-free educational environment in preschool educational institutions.

Idea
Start date: 16.12.2025

Reconstruction of part of the premises of the kitchen (dairy) building for the medical device reprocessing department and the pathological-anatomical department, at the address: 47 Zakhisnyky Ukrainy St., Starokostyantyniv, Khmelnytskyi district, Khmelnytskyi region

Date
Project status
Community
EU Funds (Donors)