Digital platform for civic engagement in European integration:
Khmelnytska oblast

Projects

Filters

Date
Project status
Community
EU Funds (Donors)
Idea
Start date: 10.07.2026

Updating and re-equipping the material and technical base of the institution with modern high-tech medical, diagnostic and laboratory equipment of the Dunayevets Multi-Profile Hospital of the DMR

The goal of the project is to increase the accessibility, quality and safety of specialized medical care by updating and re-equipping the material and technical base of the Dunayevets Multi-Profile Hospital with modern high-tech medical and diagnostic, laboratory, surgical and resuscitation equipment in accordance with the requirements of the equipment list and specifications of the National Health Service of Ukraine. Today, the level of equipment of the institution is about 70%, which does not ensure full compliance with the requirements of the National Health Service of Ukraine and modern standards for the provision of specialized medical care. Some of the equipment is morally and physically outdated, certain types of high-tech diagnostics and minimally invasive interventions are absent or are performed in a limited volume. This leads to the need to refer patients to health care facilities in other communities and the regional level, increased waiting times for medical care, additional financial costs for patients and reduced availability of quality medical services for residents of the Dunayevets urban-territorial community and adjacent territories. To achieve the set goal, the project provides for the phased acquisition, installation and commissioning of modern endoscopic, ultrasound, laboratory, surgical and resuscitation equipment, in particular a video bronchoscope, video colonoscope, video hysteroscope, arthroscope, video laryngoscope, portable ultrasound device, transurethral resectoscope, operating table, operating light, ECG and blood pressure holters, bacteriological analyzer, patient monitors and syringe pumps. At the same time, the equipment will be installed, put into operation, trained medical staff and integrated into the treatment and diagnostic process. The implementation of the project will allow increasing the level of hospital equipment to 100% in accordance with the requirements of the National Health Insurance Fund, expand the list of medical services, increase the number of patients who will receive specialized care at their place of residence, improve the quality of diagnostics and treatment, reduce the number of referrals to other healthcare institutions and increase the efficiency of using budget funds. The project will also contribute to strengthening the capacity of the hospital cluster and implementing task 3.1.1 of the Development Strategy of the Dunayevets Urban Territorial Community to improve the accessibility and quality of medical care.

Idea
Start date: 10.07.2026

Major repairs of automatic fire alarm, warning system and installation of a separate device in the premises of the Academic Lyceum of the Netishyn City Council, Shepetivsky District, Khmelnytskyi Region at the address: 30100, Netishyn, Nezalezhnosti Ave., 7

To provide Netishyn Academic Lyceum with a modern European comprehensive fire protection system that guarantees safe learning and working conditions for all participants in the process, meets the requirements of current national and educational standards and allows for a reliable response to any threats of entrapment or smoke. Additionally, to increase the level of awareness of students and staff regarding fire safety rules and preparedness for emergency situations. Methods of achieving the goal: Design and estimate work. Development and approval of project documentation in accordance with DBN and DSTU. Conducting project expertise and obtaining permits. Major repairs and installation of systems Laying new cable routes, installing certified smoke and temperature sensors in all school premises. Installation of centralized warning and evacuation control systems, installation of light indicators and backup power. Integration and configuration Commissioning work, testing of signaling and warning systems. Connection to the emergency unit of the State Emergency Service (if technically possible). Staff training and information campaign Instructing facility employees on the use of equipment and fire safety procedures. Conducting evacuation drills for students. Monitoring and maintenance Signing a contract for regular maintenance and annual system inspections.

Idea
Start date: 09.07.2026

Creation of an educational space within the framework of the "New Ukrainian School" reform - Khmelnytskyi urban territorial community

The creation of a modern educational space in gymnasiums is carried out by updating the material and technical base. The goal is achieved through repairs and the purchase of necessary teaching aids, computer and multimedia equipment, as well as furniture for laboratories. This will contribute to the improvement of learning conditions and the formation of the necessary modern competencies in students.

Idea
Start date: 08.07.2026

Providing Zakupne Lyceum, Zakupne village, Centralna Street, 7, with teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform

creating conditions under which students independently and willingly obtain knowledge from various sources, learn to use it (knowledge) to solve new cognitive and practical problems; improve communication skills by working in various groups; develop research skills and analytical thinking.

Idea
Start date: 08.07.2026

Arrangement of safe conditions (fire protection) - Kamianets-Podilskyi urban territorial community

The purpose of the project is to increase the level of fire safety in secondary education institutions of the Kamianets-Podilskyi urban territorial community by installing a fire alarm system, a fire extinguishing system, an alarm transmission system, an evacuation control system, and an external lightning protection system in the building of the Kamianets-Podilskyi Lyceum No. 13. The implementation of the project will allow: to prevent fires in wooden structural elements; to reduce the rate of fire spread in the event of ignition, which will provide additional time for the safe evacuation of students and staff; to protect buildings and educational equipment from destruction due to fire; to guarantee a high level of safety for participants in the educational process, ensuring that the facilities comply with modern fire safety norms and standards.

Idea
Start date: 07.07.2026

Major renovation of part of the building - the catering unit of the Netishyn Academic Lyceum of the Netishyn City Council, Shepetivsky District, Khmelnytsky Region at the address: Nezalezhnosti Avenue, Building 7, Netishyn, Shepetivsky District, Khmelnytsky Region

The main goal of the public investment project is a radical transformation of the school nutrition system through the creation of a safe, high-tech and aesthetically attractive space for high school students. Visual and functional modernization is aimed at integrating modern nutritional standards, strict compliance with the requirements of the HACCP system and full implementation of the principles of barrier-free and inclusion. The implementation of this goal is achieved through the synergy of technological, architectural, spatial and organizational solutions, which are grouped according to four key vectors, namely: preserving health and promoting high-quality nutrition through the implementation of an updated, rationally balanced menu adapted to the physiological needs of high school students, increasing the proportion of micronutrients, vitamins, fiber and other nutrients in the diet and forming sustainable healthy eating habits among young people; guaranteeing absolute process safety due to full compliance of the entire production cycle with the strict requirements of current sanitary legislation, integration and systematic control of critical points in accordance with international food safety standards HACCP, clear separation of raw material and finished product flows to prevent cross-contamination; energy efficiency and optimization of operating costs through a comprehensive update of the technological equipment fleet in favor of modern energy-saving models, a significant reduction in the burden on the institution's budget due to a reduction in electricity and water consumption and an increase in the overall environmental friendliness and profitability of the catering unit's production processes; inclusiveness and universal design due to the creation of unhindered access to the food receiving area for students of all categories, in particular for low-mobility groups of the population, adaptation of the height, configuration and ergonomics of the distribution lines to the needs of each child, ensuring equal opportunities and comfort for each participant in the educational process without discrimination.

Idea
Start date: 07.07.2026

Major renovation of part of the building - the catering unit of the Netishyn Gymnasium "Erudyt" of the Netishyn City Council, Shepetivsky District, Khmelnytskyi Region at the address: Myru Lane, 5, Netishyn, Khmelnytskyi Region

The goal is to modernize and overhaul the catering unit of the Netishyn Gymnasium "Erudyt"

Idea
Start date: 06.07.2026

Creation of an educational space within the framework of the "New Ukrainian School" reform (Derazhnya urban territorial community)

Creating a modern, safe and inclusive educational environment that meets the requirements of the State Standard of the New Ukrainian School (NUS), through comprehensive material and technical re-equipment of educational institutions, ensuring equal access of students to high-quality learning resources and the development of key competencies necessary for success in the modern world. The goal is achieved through technical re-equipment of secondary education institutions, namely: the purchase of interactive and computer equipment, as well as specialized teaching aids for STEM education, etc.

Idea
Start date: 03.07.2026

Construction of a dual-purpose protective structure on the territory of the Horodotsk Primary School

The main goal is to ensure the protection of participants in the educational process (students, kindergarten students, teaching and technical staff) in the event of emergencies of a military, man-made or natural nature, as well as the creation of a multifunctional space that can be used in peacetime as an educational or public space. The goals are achieved by the new construction of a dual-purpose protective structure on the territory of the Gorodok Primary School.

Idea
Start date: 03.07.2026

Reconstruction with the addition of a dining room to the existing premises of the specialized secondary school of grades I-III No. 8 at 34 Yakov Halchevsky St. in the city of Khmelnytskyi” (correction)

The project provides for the placement of the existing school building and a cafeteria for 150 seats, which is being added from the western part. A separate entrance with an asphalt concrete pavement 3.5 m wide is provided for the cafeteria building. The working project provides for the installation of a concrete drainage tray to drain surface water. The cafeteria includes the following premises: - dining hall with a distribution room; - hot shop; - dishwashing; - cold shop; - meat and fish shop; - buffet and auxiliary premises of the buffet; - recreation room; - refrigerator premises; - pantries for dry products.

Idea
Start date: 02.07.2026

Creation of a comfortable educational space in the Mokiiv Gymnasium of the Lenkovets Village Council (Major repairs (replacement of the roof and insulation of the attic floor) of the Mokiiv Gymnasium at the address: Shkilna St., 13, Mokiivtsi village, Shepetiv district, Khmelnytsky region)

The goal of the project is to provide a modern, comfortable educational space and improve the learning conditions of students at the Mokiiv Gymnasium by carrying out a major renovation of the building's roof - replacing the roof and insulating the attic floor.

Idea
Start date: 29.06.2026

Creating an educational space within the framework of the "New Ukrainian School" reform

The goal of the project is to modernize classrooms in educational institutions of the Polonsky community in accordance with the standards of the National School of Higher Education, which will improve the quality of educational services. As a result of the project, educational spaces will be created in Polonsky Lyceum No. 2 named after O. Bobrov (chemistry classroom), in Polonsky Lyceum No. 3 named after M. Svintsitsky (chemistry classroom) and in the Supporting Educational Institution Novoselytsky Lyceum (biology classroom).

Date
Project status
Community
EU Funds (Donors)