Digital platform for civic engagement in European integration:
Khmelnytska oblast

Projects

Filters

Date
Project status
Community
EU Funds (Donors)
Idea
Start date: 01.08.2026

Reconstruction of the water supply network with a diameter of 300 mm (duke) of the Pashkivsky water intake in the city of Starokostyantyniv, Khmelnytskyi region.

The main goal of the project is to provide consumers with high-quality drinking water, guarantee uninterrupted water supply and reduce the level of wear and tear of the water supply system infrastructure. The goal of the project is achieved by performing the following tasks: replacing old and worn-out pipes with modern polyethylene ones; reducing water losses during its transportation through the network; improving the overall quality of drinking water and sanitary and environmental safety; increasing the reliability of the entire system and optimizing water pressure.

Idea
Start date: 31.07.2026

Major overhaul of the heating system of the central building of the building of the Teofipol Multi-Profile Hospital of the Teofipol Village Council at Zavodska Street, 2-L, Teofipol Village, Khmelnytskyi District, Khmelnytskyi Region

The main goal of the project for the overhaul of the heating system of the central building is to improve the condition of the infrastructure, achieve energy efficiency and ensure comfortable conditions. • Optimization of the temperature regime: Bringing the microclimate parameters in the premises of the central building in accordance with the current sanitary and hygienic norms and regulations. • Energy saving: Reducing heat loss and reducing energy consumption by replacing worn-out networks and installing modern materials. • Increasing reliability: Eliminating the emergency state of existing equipment and extending the service life of the building's engineering communications. • Economic efficiency: Reducing operating costs for further maintenance and heating of the facility

Idea
Start date: 31.07.2026

Major renovation of the premises of the Bazaliya outpatient clinic of general practice and family medicine at 22 Svobody Street in the village of Bazaliya, Khmelnytskyi region

Creation of appropriate conditions, restoration and ensuring uninterrupted access of residents to quality primary medical care. Creation of comfortable conditions for patients and medical staff. Elimination of emergency defects in building structures, renovation of offices and engineering networks

Idea
Start date: 31.07.2026

Providing secondary education institutions with teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform

The "New Ukrainian School" project aims to create an educational environment that meets modern requirements, promotes the development of the student's personality, and prepares him for the challenges of the modern world. This is an important step in reforming the education system of Ukraine and increasing its competitiveness at the international level.

Idea
Start date: 31.07.2026

Major repairs of the roof and insulation of the facade of the building of the Khmelnytskyi preschool educational institution No. 18 "Zirochka" of the Khmelnytskyi City Council of the Khmelnytskyi region at 65/1 Kamyanets'ka Street in the city of Khmelnytskyi, in order to implement energy saving measures and prepare for the heating season (adjustments)

This project provides for the dismantling of the existing asbestos-cement roof, dismantling of the battens, replacement of the supporting wooden roof structures, installation of a hipped roof made of metal profiles on a wooden battens, fire protection of wooden structures, installation of attic insulation made of mineral wool boards, installation of external drainage from the roof, lightning protection of the building, installation of a roof fence. In addition, the insulation of external walls with mineral wool boards, 200 mm thick and foundations with foam glass thermal insulation boards, 200 mm thick, puttying of facades with painting. The project also provides for the replacement of metal-plastic windows of the kindergarten premises, entrance doors, plastering of slopes and installation of external drains. To install wall insulation, it is planned to dismantle metal open stairs that are in an unusable condition, install wall decoration and reinstall metal stairs. All old windows, metal-plastic windows with single-chamber double-glazed windows, glass blocks should be replaced with new metal-plastic ones. When replacing entrance door structures, they can only be replaced with door structures with reduced heat transfer resistance. This project provides for the repair of entrance porches. Installation of a ramp for MGN and the installation of visors above the entrances to the building. The project for the overhaul of the roof and facade of the preschool educational institution will be carried out taking into account the specifics of existing structures, architectural features of the building and climatic conditions of the area.

Idea
Start date: 30.07.2026

Creation of an educational space within the framework of the "New Ukrainian School" reform in the ZZSO of the Orynyn rural territorial community.

Today, secondary education institutions in the Orynyn rural territorial community are partially provided with teaching aids. However, the existing equipment is morally and physically outdated, which does not meet the requirements of the modern educational process. Some classes lack the necessary number of interactive complexes, modern computers, laboratory equipment and didactic materials, which are necessary for the implementation of the competency-based approach envisaged by the "New Ukrainian School" reform. Insufficient material and technical support negatively affects the quality of education, reduces students' motivation to acquire knowledge and limits the possibilities of teachers in using innovative technologies. The implementation of the project will ensure the modernization of the educational process by updating the material and technical base of educational institutions in the Orynyn rural territorial community. Thus, the tasks set by the "New Ukrainian School" reform in terms of material and technical support of the educational process will be unconditionally fulfilled.

Idea
Start date: 29.07.2026

Laparoscopic surgical stand in the operating room

Improving the quality, safety and efficiency of surgical care for patients by implementing minimally invasive (laparoscopic) surgical treatment methods and providing the operating room with modern equipment

Idea
Start date: 23.07.2026

Major repairs of the road surface on Kobzarya Street and Kobzarya Street in Krasyliv, Khmelnytskyi Region

The purpose of the project is to restore the transport and operational condition of the road surface on Kobzarya Street and Kobzarya Lane in the city of Krasyliv, ensure safe, comfortable and unhindered traffic of transport and pedestrians, increase the level of road safety, improve the accessibility of residential buildings and social infrastructure facilities, as well as create appropriate conditions for the sustainable development of the urban area. The goal is to be achieved through comprehensive work on major repairs of the road surface, which will include: installing a new modern asphalt concrete surface in accordance with current state construction standards; landscaping the adjacent territory after the completion of construction work.

Idea
Start date: 20.07.2026

Reconstruction of part of the internal power supply system by installing a solar power plant on the roof of Netishyn Secondary School I-III No. 2 (Netishyn Gymnasium "Harmony") at 5 Budivelnykiv St. in the city of Netishyn, Shepetivskyi district, Khmelnytskyi region

The main goal of the project is to ensure stable, safe and uninterrupted functioning of the Netishyn Gymnasium "Harmony" under martial law. The project is aimed at eliminating the risks of interruption of educational and administrative processes due to emergency or planned power outages. The following steps are provided for the successful implementation of the public investment project: Conducting a technical inspection: assessing the condition of the institution's roof, drawing up an expert report and verification calculation. Development of project documentation: preparing a plan for "Reconstruction of part of the internal power supply system by installing a solar power plant on the roof". Installation of equipment: direct installation of a hybrid solar power plant as an alternative power source on the roof of the gymnasium.

Idea
Start date: 20.07.2026

Major renovation of part of the building - the catering unit of the Netishyn Gymnasium "Erudyt" of the Netishyn City Council, Shepetivsky District, Khmelnytskyi Region at the address: Myru Lane, 5, Netishyn, Khmelnytskyi Region

The purpose of the public investment project is to modernize and overhaul the catering unit of the Netishyn gymnasium "Erudyt" to ensure compliance with modern standards and improve the quality of services. Methods of achieving the goal: major repairs of the catering unit with the replacement of outdated structures, their redevelopment, replacement of plumbing, electrical networks and ventilation; installation of modern equipment, furniture and inventory that meets current technological requirements; installation of an automatic fire extinguishing system; performance of construction and finishing works using modern and safe materials; performance of works in accordance with current construction norms and standards, coordination of project documentation with expert bodies; provision of a comfortable working space for kitchen staff and a comfortable atmosphere during meals; This comprehensive approach will ensure the modernization of the catering unit taking into account safety standards, work efficiency and minimize the existing gap between the current state and the target level.

Idea
Start date: 20.07.2026

Creation of a modern educational space within the framework of the implementation of the "New Ukrainian School" reform in the Starokryvynsk gymnasium "Patriot" of the Netishyn city council of the Shepetiv district of the Khmelnytsky region (chemistry and biology department)

The main goal of the project is to create a modern innovative educational environment for studying natural sciences in the Starokryvyi Gymnasium "Patriot" by modernizing the material and technical base of the chemistry and biology classroom. The project is aimed at ensuring equal access of students to high-quality practical education that meets the requirements of the Concept "New Ukrainian School" (NUS) and modern standards of STEM education. Methods of achieving the goal: Material renewal: Purchase of modern laboratory equipment (digital measuring instruments, microscopes, demonstration sets, Kipp apparatus), which will allow moving from theoretical training to active research activities. Infrastructure improvement: Carrying out current cosmetic repairs of the classroom premises to bring its condition into line with sanitary and hygienic requirements and ensuring ergonomic conditions for the educational process. Methodological integration: Adaptation of curricula and implementation of new teaching methods that involve interactive interaction of students with equipment and conducting 95% of practical work according to the program.

Idea
Start date: 19.07.2026

Creation of an educational space within the framework of the "New Ukrainian School" reform - Modernization of the physics room (STEM laboratory) of Letychiv Lyceum No. 2 of the Letychiv Village Council of the Khmelnytskyi district of the Khmelnytskyi region

The goal of the project is to create a modern, safe and innovative educational space in Letychiv Lyceum No. 2 of the Letychiv Village Council of the Khmelnytskyi District of the Khmelnytskyi Region according to the principles of the New Ukrainian School, by equipping a physics classroom. The project is aimed at improving the quality of natural science education, forming key student competencies, developing research and practical skills, and stimulating interest in STEM disciplines. An important aspect is creating conditions for interactive learning, implementing an activity-based approach and ensuring equal access of students to modern educational resources. Achieving the goal of the project is expected through the implementation of a set of interrelated measures: 1. Electrical installation work and power supply safety: The project provides for a complete modernization of the power and low-current networks of the classroom in accordance with the Order of the Ministry of Education and Science No. 164 and the State Standard of Ukraine. 2. Current repairs 3. Equipping with modern equipment of digital measuring complexes, demonstration sets, multimedia equipment. Which will allow to conduct full-fledged research, laboratory work and STEM projects. 4. Introduction of innovative teaching methods Integration of activity, research and project approaches in teaching physics. Use of digital tools, interactive platforms and practice-oriented tasks.

Date
Project status
Community
EU Funds (Donors)