Digital platform for civic engagement in European integration:
Khmelnytska oblast

Projects

Filters

Date
Project status
Community
EU Funds (Donors)
In implementation
Start date: 12.12.2025

New construction of water supply and sewage networks for the Zarichia microdistrict in Khmelnytskyi

Providing centralized water supply and drainage to the promising Zarichchea microdistrict in the city of Khmelnytskyi, which should be represented by residential and public buildings

Idea
Start date: 11.12.2025

"Overhaul of Starokostyantynivske Shosse Street - installation of closed drains with connection to existing storm sewer networks in Khmelnytskyi"

External storm sewer networks are designed from the existing storm sewer well located on the existing storm sewer network on the low relief of Hetman Mazepy Street with subsequent laying by horizontal directional drilling under roads and under the railway to the cut-in into the existing storm sewer well, which is located at the intersection of Proskurivska Street and Starokostyantynivske Shose Street (route 1) with subsequent drainage of storm drains along Starokostyantynivske Shose Street to the bypass canal of the Southern Bug River (route 2).
Construction is carried out by open method along the entire length of the pipeline, and the transitions under the road and railway - by horizontal directional drilling.

Idea
Start date: 11.12.2025

Reconstruction of existing gas networks with replacement of the VOG of the heat-generating Cherepovets branch of the Ivankovets Lyceum of the Khmelnytsky City Council at 36 Centralna Street in the village of Cherepova, Khmelnytsky region

The project involves replacing the existing gas meter with a G-6 membrane meter with temperature compensation elements and a GPRS modem in a metal cabinet with ventilation holes for the purpose of further safe operation of the equipment.

Idea
Start date: 11.12.2025

Construction of Melnikova Street (from Zarichanska Street to Trudova Street) in Khmelnytskyi (correction)

The goal of the project is to create a modern, safe and comfortable transport infrastructure in the northern part of the city of Khmelnytskyi by building a new Melnikova Street, which will provide an effective connection between Zarichanska Street, Starokostyantynivske Highway and Trudova Street, improve intra-city mobility and promote the further development of adjacent residential and public areas. The goal is to be achieved by building a full-fledged street with a two-lane carriageway (2×3.75 m), arranging safety strips (2×0.3 m), two-way sidewalks 2.25 m wide, a two-way bicycle path 2.5 m wide, as well as a green area with about 900 turf bushes. The comprehensive creation of transport and pedestrian infrastructure will include the installation of road surfaces, drainage systems, lighting, landscaping and traffic safety.

Idea
Start date: 11.12.2025

Major renovation of the premises of the building of the medical and health complex "G-2" of the Out-of-town children's health and recreation institution "Chaika" of the Khmelnytskyi City Council at the address: Khmelnytskyi region, Khmelnytskyi district, village of Holovchyntsi, Pidlisna st., 4/1 with the implementation of energy efficiency measures

The goal of the project is to create modern, safe and energy-efficient conditions for the functioning of the medical and health complex "G-2" through a comprehensive overhaul of the building, redevelopment of the premises in accordance with functional needs and the introduction of a full cycle of engineering systems that the facility did not previously have. The goal will be achieved by implementing architectural and construction works, arranging internal water supply and sewage networks, installing a new modular heating and hot water supply system, which is being installed for the first time due to the complete absence of heating, arranging ventilation, modernizing electrical networks, installing an automatic fire alarm system, a centralized fire surveillance system and a people evacuation control system. The current condition of the building is characterized by significant physical deterioration of structures, the absence of any heat engineering systems, non-compliance with energy efficiency requirements, sanitary and fire safety standards, as well as irrational planning, which limits the possibility of its use for its intended purpose. The target state involves the creation of a completely renovated, energy-efficient, safe and functional facility, equipped with modern engineering networks, rational planning and a high level of comfort, which will ensure effective and long-term operation of the complex.

Idea
Start date: 11.12.2025

Reconstruction of the Department of Physical Rehabilitation and Neurology of the Municipal Enterprise "Khmelnytskyi City Children's Hospital" of the Khmelnytskyi City Council at the address: Khmelnytskyi, Oleha Olzhycha St., 1

- The facility complies with the standards of the State Code of Civil Procedure, the State Emergency Service;
- Measures are provided for the needs of low-mobility population groups;
- Energy saving measures are provided;

Idea
Start date: 10.12.2025

Ensuring proper living conditions for war veterans (acquisition of housing)

Providing veterans with housing improves their psycho-emotional state, promotes social stability and integration, increases the level of well-being of their families, reduces social tension, and forms a positive attitude towards the state, which cares about its defenders.

Idea
Start date: 10.12.2025

New construction of storm sewer networks in the Zarichia neighborhood in Khmelnytskyi

The purpose of the project "New construction of storm sewer networks in the Zarichia microdistrict in Khmelnytskyi" is to create a modern, effective and reliable drainage system for future residential and public spaces. Since the microdistrict is at the design stage, the lack of engineering infrastructure makes it impossible to further develop the territory and build residential, social and commercial facilities. The main task is to ensure comprehensive drainage of stormwater, prevent flooding and destruction of infrastructure, as well as create conditions for safe, environmentally friendly and effective management of water resources in the territory of the future microdistrict. The purpose of the project also includes ensuring that construction complies with modern norms and standards, providing for the possibility of connecting residential buildings, public facilities and green areas to the system, as well as creating prerequisites for the sustainable development of the microdistrict. The implementation of the project will not only solve engineering and environmental problems, but will also contribute to increasing the investment attractiveness of the territory.

Idea
Start date: 10.12.2025

Reconstruction of part of the main building of the DEPOT for 100 cars (lit. A-2, lit.) of the Khmelnytskyi municipal enterprise "Electrotrans"

The project's goal is to provide proper technical, engineering and operational conditions for servicing the enterprise's modern rolling stock by reconstructing part of the main building of the DEPOT and modernizing its internal infrastructure. This goal is expected to be achieved by updating physically and morally outdated premises, improving the technical condition of the building, replacing worn-out structural elements, modernizing engineering networks, installing modern equipment and creating safe and comfortable working conditions for personnel.

The current condition of production premises, engineering networks and equipment does not meet the requirements for servicing modern vehicles, which leads to an increase in the duration of repair operations, increased operating costs, limiting the efficiency of personnel work and reducing the service life of rolling stock. The target level provides for the building's compliance with technical standards necessary for high-quality and prompt repairs, reducing transport downtime, optimizing energy consumption and ensuring accessibility for all categories of users.

The existing gap between the current and target state consists of physical wear and tear of premises and networks, lack of modern ventilation, heating, electricity and water supply systems, insufficient level of equipment and non-compliance of working conditions with modern requirements. The implementation of the project will allow to eliminate this gap through comprehensive reconstruction, which will ensure the effective use of the updated infrastructure for the needs of the enterprise and improve the quality of transport services to the city's residents.

Idea
Start date: 10.12.2025

providing housing for large foster families (family-type orphanages) in the Khmelnytskyi territorial community

The public investment project "Providing housing for large foster families (family-type orphanages)" aims to provide decent housing for large foster families raising 5-10 children without parental care, in order to provide them with conditions for living in a warm family atmosphere. To achieve the set goal, it is planned to implement the following main measures: - purchase of a residential building that meets the established area standards (the total area of which exceeds 262 sq. meters (excluding an additional 10 sq. meters for each child with a disability) and requirements for technical condition, safety and improvement; - conducting an inspection and selection of residential facilities that meet sanitary, technical, engineering and spatial requirements for accommodating a foster or large family; - preparation of the necessary documentation - title documents for the purchased facility, making changes to registers, registration of rights of use; - arrangement of housing in accordance with the needs of the family and children: provision with furniture, household appliances, essential items; - support and assistance to the foster family or DBST, including social, pedagogical and psychological support from responsible community services.

Idea
Start date: 10.12.2025

New construction of Lisogrynivetska street (from Stepana Bandera street to Starokostyantynivskyi highway) in Khmelnytskyi

The purpose of the project "New construction of Lisohrynivetska Street (from Stepana Bandera Street to Starokostyantynivskoho Highway)" is to develop the engineering and transport infrastructure of Khmelnytskyi, ensure sustainable transport connections of the Ozerna microdistrict with the main highways of the city, increase the capacity of the street and road network and the level of road safety. The need to implement the project is due to the intensive residential development of the microdistrict, population growth and a significant increase in traffic flows, which leads to congestion of existing streets, complication of transport connections and a decrease in the quality of transport service.

Idea
Start date: 10.12.2025

New construction of a civil defense building for Khmelnytskyi preschool educational institution No. 15 "Red Riding Hood" of the Khmelnytskyi City Council of the Khmelnytskyi region at 23 M. Trembovetskaya St., Khmelnytskyi (correction)

The civil defense shelter is intended for sheltering children and preschool employees. The total capacity of the civil defense shelter is designed for 115 people, including 75 children and 40 preschool staff. The civil defense shelter houses the main rooms for sheltering children of group centers (nursery, junior, middle and senior groups): a nursery group shelter with accommodation for 15 nursery children; a junior and middle group shelter with accommodation for 40 children (20 junior children and 20 middle-aged children); a senior group shelter with accommodation for 20 older children. The shelter rooms are equipped with places for lying and sitting. The detailed design provides for the location of bunk and single-tier children's beds with the subsequent use of the first tier for seating. The beds are 2.1 m x 0.75 m and 1.35 m x 0.55 m in size, and the seats are 0.45 m x 0.45 m. The main shelters are equipped with children's tables and places for people with disabilities in wheelchairs and crutches. A suitable room is provided for the service personnel, which is equipped with a wardrobe and office chairs. The nurse's station is equipped with a medical cabinet, office chairs, and a medical table. Food storage rooms are equipped with shelves. The protective structure is equipped with heating, ventilation, power supply, fire alarm, water supply, and sewage systems.