Digital platform for civic engagement in European integration:
Khmelnytska oblast

Projects

Filters

Date
Project status
Community
EU Funds (Donors)
Idea
Start date: 23.04.2026

New construction of a street from Stepana Bandera Street to Zakhidno-Okruzhnaya Street in Khmelnytskyi

In order to develop the engineering and transport infrastructure of Khmelnytskyi and in connection with the intensive development of the Zarechye microdistrict of Khmelnytskyi and the increase in traffic flow, the detailed design provides for the construction of a new street from Stepana Bandera Street to Zakhidno-Okruzhnaya Street.
The designed street will connect Stepana Bendera Street with Zakhidno-Okruzhnaya Street, which will allow road users to shorten the route from the central district of the city to the western ring road of Khmelnytskyi, which will reduce travel time and reduce the amount of harmful emissions into the city's atmosphere.
The designed street is planned as a main street and is classified as a street of district significance with two traffic lanes of 3.0 m each, a bicycle path 3.0 m wide and two pedestrian paths 2.25 m wide. On the right, the carriageway is separated from the pedestrian path by a green zone, 3.0 m wide. On the left, the carriageway is separated from the bicycle path by a green zone, 3.0 m wide. The total length is 2486.00 m.

Idea
Start date: 22.04.2026

Modern educational space in the Municipal Institution of General Secondary Education "Lyceum No. 1 named after Volodymyr Krasytskyi of the Khmelnytskyi City Council" of the Khmelnytskyi Urban Territorial Community

The main goal of the project is to create a safe, comfortable and motivating educational environment; improve the quality and efficiency of the educational process; develop key 21st century competencies in children - creativity, critical thinking, communication, digital literacy; increase the prestige of education and strengthen community trust in the school system. The implementation of the project will be an important step towards the implementation of the standards of the New Ukrainian School and the creation of a modern educational space for the development of successful, competent and responsible youth. As a result of the project, two modern biological educational spaces will be created, which will provide appropriate conditions for conducting theoretical, practical and laboratory classes and improving the quality of the educational process (1 biology laboratory and 1 biology classroom). The goal is achieved through repairs and the purchase of equipment, furniture, and multimedia and computer equipment.

Idea
Start date: 21.04.2026

New construction of a road from the junction between Sichovykh striltsiv Street and Hetmanska Street in Khmelnytskyi

The purpose of the project is to ensure safe and convenient transport and pedestrian connection between Sichovyh Striltsiv and Hetmanska streets in the city of Khmelnytskyi by constructing a new 486 m long thoroughfare, which will improve the accessibility of the territory, increase the mobility of the population and develop the infrastructure of the microdistrict. The goal is to achieve this by performing a complex of construction works, in particular, the arrangement of the carriageway, sidewalks, drainage system, outdoor lighting. Currently, there is no proper thoroughfare that would provide direct transport and pedestrian connection between the specified streets, the existing directions of movement are disorganized or absent, which complicates the accessibility of the territory, reduces the level of safety and hinders the development of the microdistrict. The implementation of the project will allow to eliminate the existing infrastructure gap by creating a full-fledged thoroughfare that will meet modern requirements for safety, comfort and functionality of the urban environment.

Idea
Start date: 21.04.2026

New construction of the road from Sichovyh striltsiv Street to Hetmanska Street in Khmelnytskyi

The goal of the project is to ensure unhindered and safe transport and pedestrian connections of the microdistrict by building a new road from Sichovyh Striltsiv Street to Hetmanska Street in the city of Khmelnytskyi with a length of 825 m, which will contribute to improving the accessibility of the territory, developing engineering and transport infrastructure and improving the quality of life of residents. The achievement of this goal is envisaged by performing a complex of preparatory and construction works, in particular, arranging the roadway, arranging sidewalks to ensure pedestrian accessibility, building a drainage system (storm sewer), installing outdoor lighting, organizing safe traffic using road signs and markings, as well as landscaping the surrounding area.

Idea
Start date: 02.03.2026

Reconstruction of a built-in pharmacy for the administrative premises of the Khmelnytskyi City Council's Administrative Services Department at 38 Kamyanetska Street in Khmelnytskyi

The reconstruction involves changing the functional purpose of the premises from a pharmacy to administrative premises for the provision of administrative services. The facility is located in a separate part of a built-in-extension pharmacy of a 9-story residential building at the address: Kamyanets'ka St., 38, in the central part of Khmelnytskyi. The 1st floor level includes a lobby, administrators' work rooms, a staircase, offices, staff rooms (wardrobe), public and staff bathrooms, a switchboard and a room for cleaning equipment. The basement level houses a heating station and a water meter, an archive, an electrical panel and household rooms for cleaning equipment. The height of the 1st floor premises is 3.4 m, and the basement is 2.24 m. The exterior and basement decoration involves the use of a facade insulation system with subsequent application of decorative plaster.
The problem that the project solves is the significant overload of the existing administrative service centers in the city of Khmelnytskyi. The existing ASCs operate with a high level of load, which leads to queues, long waiting times, and a decrease in the availability and quality of services for the population. The current situation is characterized by insufficient throughput capacity of the existing centers, which does not meet the current demand for administrative services. The goal of the project is to create a new modern administrative service center that will reduce the load on the existing ASCs, improve the quality and speed of service to citizens, and improve the availability of services in the central part of the city. The goal is to achieve this goal by reconstructing the premises into a full-fledged administrative center with the organization of functional areas for receiving citizens, arranging modern working conditions for administrators, creating a comfortable infrastructure for visitors, and providing technical premises to support uninterrupted operation. The implementation of the project will eliminate the existing gap between the actual load on the ASC network and their capacity, as the new center will allow for an even distribution of visitor flows, reduce waiting times, and increase the overall efficiency of the system for providing administrative services in the city.

Idea
Start date: 23.02.2026

Construction of an artesian well, water tower and water supply in the village of Malashivtsi, Khmelnytskyi district, Khmelnytskyi region (adjustment), I stage of construction

The goal of the project is to create a reliable and autonomous centralized water supply system for the residents of the village of Malashivtsi, which will provide the community with high-quality drinking water in the required quantity. The implementation of the first stage of construction is designed to solve the problem of water shortage, improve the sanitary and epidemiological situation in the settlement, and increase the level of daily comfort of residents.

Idea
Start date: 23.02.2026

Major renovation of the catering unit of the Municipal Institution of General Secondary Education "Lyceum No. 13 of the Khmelnytskyi City Council" at the address: Khmelnytskyi, Panas Myrnogo St., 27/1

The project provides for:
- dismantling of brick partitions in the premises;
- dismantling of old plaster from the walls;
- dismantling of tiles 1.5m high on the walls;
- dismantling of old plaster from the walls;
- dismantling of wall cladding (plastic panel, chipboard) in note 1;
- dismantling of existing floors (ceramic tiles) within the framework of major repairs;
- new partitions to be made of ordinary clay bricks of plastic
pressing M75 on mortar M50 (REI 15);
- performing interior decoration of the premises;
- arranging floors;
- arranging jumpers;
- dismantling of old and installing new windows, stained glass windows and doors according to the specification of the elements;
- arranging of drains (in places where windows are replaced);
- arranging of window sills (in places where windows are replaced);
- repair of internal slopes (in places where windows and doors are replaced).
The catering unit, which is subject to major repairs, is designed for 192 seats.
The designed dining room operates on raw materials and is equipped with the necessary thermal and mechanical equipment for cooking and refrigeration equipment for
short-term storage of raw materials.

Idea
Start date: 22.02.2026

Project "Khmelnytskyi - a city without barriers"

The route connects key community facilities — the ASC, polyclinic No. 2, bus station (suburban), public transport stops and public space (the largest park in the city) and passes through the busiest part of the settlement, which residents use daily. The average daily passenger flow of the selected route is over 33,000 people. The existing pedestrian and transport infrastructure does not fully meet the requirements of barrier-free access, so the route is formed as the most socially significant direction, providing access to basic administrative, medical and social services.
The route is used daily by residents of the community villages who arrive in the city to the bus station, students, employees and visitors to institutions, patients, public transport passengers, families with children. After the arrangement, it is expected to increase pedestrian activity and improve the accessibility of the space for veterans, people with disabilities, the elderly, parents with strollers and children of school and preschool age.

Idea
Start date: 22.02.2026

Major renovation of the catering unit of the Municipal Institution of General Secondary Education "Gymnasium No. 28 named after Vyacheslav Chornovil of the Khmelnytskyi City Council" at the address: Khmelnytskyi, Symona Petliura St., 12

To provide a major overhaul of the school’s catering unit to create safe and modern conditions for organizing student meals. The project is aimed at updating the premises and equipment in accordance with sanitary and safety standards, which will ensure high-quality and healthy nutrition for children. The purpose of the major overhaul of the catering unit is to create safe, modern and comfortable conditions for cooking, bringing the premises into compliance with sanitary standards and HACCP requirements. This involves replacing worn-out communications (ventilation, water supply, electrical networks), updating equipment and improving the quality of food.
The main tasks and purpose of the major overhaul:
Compliance with safety standards: Implementation of the HACCP system, ensuring sanitary and hygienic requirements.
Modernization of equipment: Replacement of old technological, heating and refrigeration equipment with modern, energy-efficient ones.
Improving working conditions: Creating comfortable conditions for staff, updating the ventilation system and lighting.
Improving the quality of food: Ensuring rational and high-quality nutrition for students in the gymnasium.
Infrastructure update: Replacement of worn-out utilities, renovation of premises, which increases the operational performance of the building.
Creation of a modern zone: Transformation of the dining room into a modern eating and relaxation area.

Idea
Start date: 21.02.2026

Reconstruction of sewage treatment plants (STP) and installation of solar electric panels (SEP) in the city of Khmelnytskyi in Ukraine

Treatment plants will ensure the proper quality level of timely wastewater treatment. As a result, it will prevent irreparable pollution of water bodies and soil, groundwater. This is important for the ecology and will also affect flora, fauna, human and animal health.

Idea
Start date: 16.02.2026

New construction of a road from 18 Vinnytske Shose St. to Vinnytske Shose in Khmelnytskyi

The purpose of the project is to ensure proper transport accessibility of the industrial park territory in the city of Khmelnytskyi, create conditions for the development of industrial production, attract investments, increase economic activity and form a modern engineering and transport infrastructure. The goal is to achieve this goal by constructing a new road from 18 Vinnytske Shose Street to Vinnytske Shose with the installation of a road surface of regulatory strength, surface drainage systems, the organization of safe traffic and pedestrians, the arrangement of landscaping elements, technical means of organizing traffic and engineering infrastructure in accordance with the requirements of state construction standards. Today, the transport connection of the industrial park territory is insufficiently developed or partially absent, which limits the access of specialized transport, complicates the logistics of enterprises, inhibits the attraction of investors and the development of production capacities. The existing state of the territory does not meet the regulatory requirements for road safety, capacity and operational reliability of road infrastructure. The implementation of the project will allow to eliminate the existing infrastructure gap between the current state of transport provision in the territory and the target level of functioning of the industrial park, create favorable conditions for the location of new enterprises, the development of production, the creation of jobs, and the increase in revenues to the local budget.

Idea
Start date: 13.02.2026

Reconstruction of a water pipe with a diameter of 500 mm along Myru Avenue from P. Myrny Street to Starokostyantynivske Highway in Khmelnytskyi

The water supply along Prospect Myru of the city of Khmelnytsky was built in 1973 from steel pipes with a diameter of 500 mm, the standard service life of which is up to 20 years. This water supply runs at a great depth and today has fully exhausted its operational and technical resource and is considered emergency. It provides centralized water supply to the population and industry along Prospect Myru and adjacent streets, microdistricts Vystavka, Ozerna.
Every year there are 5-6 emergency situations. During the elimination of accidents, it is necessary to stop the water supply, and accordingly, the drainage, of a large part of the city.

Date
Project status
Community
EU Funds (Donors)